The historic pedestrian footbridge over the railway line has been found to be defective and is to be replaced over the next few months. This will require a new temporary entrance to the ticket hall and the construction of a temporary footbridge further down the platform while the works are carried out. As part of the contract the side walls and roof to the ramp access to College Road will be refurbished.

Go to top